Reconstruct the section after the well — time, cost, performance and dysfunction, benchmarked against plan and offsets, with lessons captured for the next programme.

One connected record, benchmarked against plan and offset wells.
Each section rebuilt from the drilling log, mud, wireline and reports on one connected timeline.
Drilling, connections, trips and NPT — broken down and benchmarked against baseline.
Measured against AFE budget and offset baselines, with the drivers behind the variance.
Performance per section against plan and offset wells, section by section.
Footage, ROP, durability and dull condition attributed to each BHA run.
ROP, MSE efficiency, dysfunction frequency and connection time in one view.
Provide one section; Sentinel reports what it would have classified, scored against the operator’s drilling reports.
Sign in